Prospect Centerlink

The main objective was to design a complex that meets the basic functions of a Centrelink office, so we decided to work with industrial materials that are easy to install, operate and maintain in the future. The front facade is modulated, based on the predominant materials, glass and precast panels, to create a rhythm along the main street. Similar design treatment was used in developing the rest of the elevations. All fa├žade elements are jointed together with a sloping bottom canopy, stretched to the building perimeter.